This storage building was designed to act as a secure area to store train maintenance parts. The steel work is hot dipped galvanised, with plastisol cladding to its sides and opal PET cladding to the roof. The building features a pair of 2.5m wide lockable doors to the front and fire escape door to its rear.
Full product specifications can be found on our technical data page.